Huichol page 29  June 7th trip (cont)

Hold mouse arrow over pic for caption 
(only works with internet explorer browser) 

TeBrucio and Librado laying in the mud. Getting close to the left side now. 
In fact we stopped there and poured the foundation hole and left side pillar 
and then came back to meet that part of the slab so the corner was locked 
in securely.

TeBurcio and Librado putting in the concrete

Finished first meter of 12 meter slab. We've a ways to go yet. They are supposed to complete the next two meters by next Wednesday so I have 
a flat place to lay the trusses out on and weld them together. 

We are using 6" x 3/16" U channel for the trusses. It was cheaper than 
doubling up the 8" 14 gauge stock and gives us some meat to weld the 
cross pieces to. I have cut out the 6" U channel in my shop at home and 
will do all the welding there. 

Cutting 6" U channel to length in shop at home.

The hard part is cutting the long 55cm diagonals in the cross braces. They cannot be cut with the metal cutting bandsaw and must be cut by hand using 
a sawzall reciprocating saw. I am going to pick Chaleo up at Campamento tomorrow and he is going to work on that part while I cut out the 2" angle bar 
and flat stock to secure the cross pieces the roof sets on to the 6" U channel.

Laying out truss cross braces to cut the 15 degree angles in them

This is Chaleo and Angel (Tomo's son) at  my place using the sawzall to cut the long dagonals in the 3/16"  6" U channel for the trusses. 6 cuts took all day long.

Diagonal cuts in U channel

This was not a fun part of the job.

Diagonal cuts in U channel fro cross braces